Springfield, 2012
Birth of a Home: stick-built
A cleared hilltop in July, a finished home under snow. This house was photographed the whole way through — 90 times. These are 26 of them, in the order they were taken.
The land
A hilltop cleared and graded, and a road cut in to reach it. Nothing here yet but the view the house was put there for.
The foundation
Insulated panels set and backfilled, steel columns under the beams, then a floor decked over the whole footprint.
Framing
Walls up, roof on, and the plan suddenly readable — rooms you can walk through before there is anything to walk on.
Weathering in
Wrapped and roofed. The point where a build stops racing the weather and the inside work can start.
The stone
Laid by hand, course by course — the gable ends, the porch piers, the chimney, and the knee-walls inside.
Inside
The fireplace finished to the ceiling, the kitchen set, floors down. Everything that was a chalk line in the framing photographs.
Finished
Snow on the roof, drive laid, and the same hilltop from the first photograph — with a house on it.